$500
Brick + Setup Visit
1 Year
Pad Certification
AZ + 4 Corners
Heavy Haul Service Area
Same-Day
Quote Response
New · Brick + Pad Setup
You bought the shed. The shed shows up in two weeks. What happens between now and then?
🧱

Brick + Runner Delivery

Palletized bricks delivered straight to your pad site. We coordinate with your stone yard so you're not chasing pallets around town.

  • Two pallets typical for a 12×40
  • Dropped exactly where you need them
  • One delivery fee · cheapest option around
📐

Pad Setup & Install

We lay the runners level. 4-foot clearance between the two skids on at least one side so the mule can bring your building in clean.

  • Runners spaced to spec (every 6 ft)
  • Doors will hang true on day one
  • Driver doesn't break the build down on arrival
🛡️

1-Year Pad Certification

If a door stops swinging right inside the first year because the pad shifted, we come back and re-level. In writing. Your building stays your building.

  • Doors stay aligned · level holds
  • One re-level included
  • Contracted & documented · not a handshake
See Brick + Pad Details → Reserve Your Pad Slot →
Heavy Haul · The Established Lane
Sheds, containers, trailers, cross-state moves. Northern Arizona's hardest routes handled with route intel built in.
🏚️

Shed Relocation

Portable buildings — Graceland, competitor brands, custom builds. Yard to yard, lot to property.

📦

Container Moves

20' and 40' shipping containers. Loaded or empty. Tilt-bed delivery for tight rural placements.

🚚

Heavy Trailer Transport

Equipment trailers, dump trailers, gooseneck loads. Permitted runs across Northern AZ.

🗺️

Cross-State Moves (AZ)

Within Arizona — Flagstaff to Tuba City, Williams, Page, the reservations. We know the roads.

The Differentiator: Route Intel.

National fleets quote off Google Maps. Northern Arizona doesn't work that way. The route between two pins is a wash crossing, a 9% grade, a reservation jurisdiction line, a county weight limit, or a rancher's gate that's narrower than your load. We've already driven your route.

See Heavy Haul Details →
Already Have a Building?
Two more lanes we run · for the folks who already own a shed and need it handled.
🚚

Building Moves

Need a building moved across the property — or 40 miles up the road? $350 min show-up · ~$1,100 typical 1-mile move. Waiver required for low-quality builds. Over 40-foot moves? See Heavy Haul.

  • Photo + measurements + map pins → quote in 24h
  • Serial number check before we hook up
  • Honest "no" if it can't be moved safely
See Building Moves →
🔧

Re-Leveling

Door not working? Building shifted? $250–$450 typical 1-day visit. The dealer doesn't service those calls — we do. Re-survey, adjust runners, re-shim, doors retested.

  • Doors stick · floor feels off · windows binding
  • Out by sundown most jobs
  • Upgrade to 1-year cert to stop calling back
See Re-Leveling →
How the Pad-Setup Pipeline Goes
From the lot conversation to the building hooked up to power. One number, start to finish.
1

You Bought the Shed

Graceland · S&S Wolf Sheds · any portable building dealer. The lot tells you the building ships in two weeks. You walk out wondering what to do next.

2

Call Wolf Transport

One phone call. We coordinate the bricks, schedule the pad setup, and lock the dates so the runners are ready before the driver shows up.

3

Pad Goes In

We deliver the pallets. We lay the runners level. We mark the 4-foot clearance line. The driver pulls up to a pad that's already done.

4

Building Lands Clean

The mule glides the building onto runners that hold. Doors swing true. Nothing rocks. We certify the pad for one full year.

5

Need Anything Else?

Drywall · electrical · plumbing · seal it up · cut a tree · roll a boulder out of the way. Four contractors on speed-dial. See the network →

"We got a guy who actually delivers the pallets to you. He drops them off, and if you pay him extra, he'll place them exactly where you need them. You don't even have to worry about it. Then if you want, I can establish the delivery pad with you and the driver, make sure they're laid out — and afterwards, I'll certify this pad for one year to make sure your doors work." — Wolf Transport · The new pipeline · in his own words
After the Building's In
Drywall · electrical · plumbing · sealing · odd jobs. Four vetted contractors on the bench, ready to roll.
🔨

Drywall & Finish

Inside walls, ceiling, paint-ready surfaces. Licensed, insured, contracted.

Electrical

Run power to the building. Outlets, lighting, sub-panels. Code-compliant.

🔧

Plumbing

If your shed becomes a workshop, studio, or guest space — water in, water out.

🌳

Odd Jobs

Tree cut down. Boulder pulled out. Patio step poured. $75 winch pull energy.

See the Full Network →
Why Wolf Transport
Same family that's been moving sheds across Northern Arizona for years. Now we're prepping the pad too.
👨‍👩‍👧

Family Built

Same Wolf family as S&S Wolf Sheds. Multi-generational. You're not calling a dispatcher — you're calling Scott. About the family →

📜

Contracted Work

Everything signed. Pad cert in writing. Contractor referrals on a real signed scope. We cover ourselves legally — that means you're covered too.

🛣️

Local Routes

We've already driven the back roads. We know the wash crossings, the grades, the gates. The pad gets done because the truck actually got there.